Hi,
We have recently upgraded our development ECC system to ECC 6.0 EHP 6 from EHP4. We found there are lot of roles affected by
the upgrade in step 2c of SU25.All the proposed changes are due to step 2a which updates the objects/transactions which were never modified by the customer.
While we are still analysing the roles in DEV, the production upgrade date is fast approaching.
Is it advisable to upgrade the Production now and perform the SU25 in DEV later and promote the roles to Production after proper testing in QA?
or is it something we have to do immediately after the upgrade before releasing it to the end users?
Thank you in advance,
Silver